Initial commit: Odoo 18.0-20251222 extra-addons
Some checks failed
pre-commit / pre-commit (push) Has been cancelled
tests / Detect unreleased dependencies (push) Has been cancelled
tests / test with OCB (push) Has been cancelled
tests / test with Odoo (push) Has been cancelled

This commit is contained in:
tocmo0nlord
2026-03-13 20:43:25 +00:00
parent 36e847a7df
commit adbe430761
9472 changed files with 1265727 additions and 0 deletions

View File

@@ -0,0 +1,12 @@
Typically, when a purchase invoice is created at a price different from
the price at which the SVLs of the incoming picking were initially
created and confirmed, SVLs are generated to account for the price
difference. Once this happens, the invoice cannot normally be reverted
to draft due to stock_account restrictions.
Imagine international business settings where exchange rates are updated
daily; this limitation can be problematic. For example, if goods are
received on April 17th and the vendor bill is processed on April 18th
with a different exchange rate, an SVL record is generated, locking the
vendor bill. If a user then realizes a mistake, such as processing the
bill for the incorrect purchase order, they are unable to cancel it.

View File

@@ -0,0 +1,8 @@
- [Tecnativa](https://www.tecnativa.com):
- Víctor Martínez
- Pedro M. Baeza
- `Quartile <https://www.quartile.co>`_:
- Yoshi Tashiro
- Aung Ko Ko Lin

View File

@@ -0,0 +1,6 @@
This module allows a vendor bill to be reverted to draft status even
when an SVL (Stock Valuation Layer) record is created due to a price
difference between the receipt and the vendor bill, when inventory from
the receipt has yet to be consumed. When a vendor bill is reset to
draft, as applicable, a new SVL record is generated to offset the
valuation difference that was generated upon the bill's confirmation.

View File

@@ -0,0 +1,16 @@
1. Create a product category with Costing Method: Average Cost (AVCO)
or First In First Out (FIFO).
2. Create a product linked to the category created before.
3. Create a purchase order and adds a product line with quantity 1 and
price 10.
4. Confirms the purchase order and validates the incoming picking.
5. Creates an invoice from the purchase order.
6. Changes the invoice line price to 12 and confirm the invoice.
7. It is possible to reset the invoice to draft (a new SVL record to
offset the existing SVL difference will be created).
When attempting to reset an invoice to draft for a product that has been
partially or fully consumed, the system will display the following error
message: "The inventory has already been (partially) consumed." In that
case, consider using landed costs to adjust the valuation of the product
as necessary.